The single largest cost driver is never technology — it is almost always uncertainty. Every ambiguity in the requirements becomes a buffer inside the number you receive. A team that cannot see the exceptions and edge cases has to assume a pessimistic case. Spending a week on a discovery phase can cut the total far more than haggling over hourly rates.
Integrations are the second big multiplier. A screen that writes to your own database is predictable; the same feature wired into an old accounting system is not. The effort hides in the other system: rate limits and sandbox access, slow approval cycles, data that does not match your model. Ask any vendor to list every external system, as this is the usual source of overruns.
Non-functional requirements silently change the number. An application used by twenty people is a very different build from the same feature set handling thousands of external customers. Security reviews, high availability, scalability, audit logging and multi-language support all add real engineering time. State them early livewire or react else expect the estimate to move later.
Who actually does the work changes the arithmetic. A day rate tells you little on its own: an experienced engineer at a higher rate can be cheaper per delivered feature than two inexperienced developers who require constant review. Also ask which roles are billed: technical consulting services project management, testing, infrastructure work and analysis are real work, but they must be visible in the estimate.
The number in the proposal is rarely what you will actually spend. Expect hosting, subscriptions and licences, observability and a software maintenance and support services allowance annually. A reasonable rule of thumb is that any production system consumes a meaningful share of the original budget every year for updates, security patches and small improvements. Ignoring this is the most frequent planning error.