Chatham County Still Accepting Feedback for Proposed Green Island Path

By Karl Stephens, CMCA, AMS, PCAM
General Manager/COO

If you have not yet shared your feedback with Chatham County on the Proposed Green Island Path, please do so soon. Feedback will be accepted through January 3. ClickĀ hereĀ to share your feedback via a County survey. The path is planned to run approximately 2.1 miles from the cul-de-sac on Green Island Road to Diamond Causeway, with connection to the existing paths on the north side of Diamond Causeway.Ā 

Join Public Works Director Sean Burgess and me as we walk you through the proposed path location and the currentĀ design. ClickĀ hereĀ to watch the video. For more details on the proposed path, clickĀ hereĀ to visit the Countyā€™s project page.



This article was originally published by The Landings Association on their website.

Visit landings.org to read the original article.
https://landings.org/news/2024/12/18/chatham-county-still-accepting-feedback-proposed-green-island-path